Five days in Gilbert: a foreclosure pool comes back.

Eighteen months unattended. Water the color of split-pea soup. Here’s the full rescue, chemistry log included.

LocationGilbert, AZ
ServiceGreen-to-Clean
Timeline5 days
TodayOn the Tuesday route

When the Hendersons closed on their Gilbert house in late May, the inspection report had one line that made their realtor wince: “Pool: non-functional, heavy algae.” The previous owner had walked away eighteen months earlier. The pump had seized. The water, all 17,000 gallons of it, had gone fully feral.

They sent us three photos on a Tuesday. By Wednesday morning, Marcus was standing at the edge of the swamp with a test kit, and we’d quoted exactly what we’ll show you below: five days, one number, guaranteed.

Day 0 Day 5
The whole rescue, one tap apartGilbert, AZ · 17,000 gallons

What we walked into

Day-zero testing told the whole story. Chlorine: zero, obviously. But the bigger villains were invisible, stabilizer (CYA) at 180 ppm from years of trichlor tabs, meaning even shock-level chlorine would be handcuffed. And the seized pump meant nothing could circulate anyway.

So the plan had three moving parts: a pump replacement on day one, a partial drain to knock the CYA down to workable levels, then the standard kill-clear-polish sequence with the filter rebuilt mid-stream.

The chemistry log

These are the actual day-zero and day-five readings from the service reports, the same format every customer gets by text.

ReadingDay 0 · as foundDay 5 · handoff
Free Chlorine0.0 ppm3.0 ppm
pH8.47.5
Total Alkalinity40 ppm95 ppm
CYA (stabilizer)180 ppm (partial drain required)45 ppm
Water clarityOpaque, floor invisible at 6″Floor crisp at 8′ deep end

Day by day

Day 1, New variable-speed pump installed by noon. Partial drain to dilute stabilizer. Heavy shock at dusk, pump running 24/7.
Day 2, The satisfying part: green turned cloudy gray-blue overnight (dead algae). Full perimeter brush-down, first filter clean.
Day 3, Vacuumed the kill to waste, dosed clarifier, second filter clean. The shallow end found its floor.
Day 4, Fine filtration and rebalancing from shock levels toward swim-safe. Tile line scrubbed of the scum ring.
Day 5, Final readings verified (table above), surfaces inspected, swim test passed with an actual cannonball.

“We honestly budgeted to resurface the whole pool. Five days and it looks brand new, the day-by-day photo updates were weirdly addictive.”
, K. Henderson, Gilbert

The part that matters most

Every rescue ends with the same question: how do we keep it this way? The Hendersons rolled straight onto the Tuesday weekly route with their rescue discount. Eleven months later, their pool has never been green for a single day, and they have 47 photo reports proving it.

More transformations

Keep browsing

All our work
Tile & SurfaceCalcium line, bead-blasted offMesa
Green-to-CleanMonsoon cleanup, 48 hoursAhwatukee
Weekly ServiceThree years on the Tuesday routeScottsdale

Got a swamp of your own?

Send a photo. Get a day count and a guaranteed number, usually within the hour.

No contracts · No spam · Just sparkling water

Back to portfolio